Location Report: 226 latest
Date: 25 DEC 1996
Time: 01:56 (GMT)
Race Leg: 2 - Rio de Janeiro to Wellington

This page contains archived tables generated at the time shown.
You can use the bookmarks below to move quickly to each table.

Yacht Data Arrival Times

(Back to Index)


[Table generated from Report 226 on 25 DEC 1996, 01:56.] (Go to top)

YACHT DATA
Yacht Name Time of Fix
(GMT)
Latitude Longitude CMG SMG DTF VMG 24 hr run
01 Group 4 25 DEC 01:50 48 46.64S 171 23.16W 309 07.9 0739 07.3 199
02 Save the Children 25 DEC 01:50 49 17.96S 170 40.44W 302 07.4 0779 07.2 191
03 Toshiba Wave Warrior 25 DEC 01:50 49 29.00S 167 55.56W 296 08.3 0878 07.1 185
04 Global Teamwork 25 DEC 01:50 48 55.76S 166 32.04W 296 09.6 0913 07.1 199
05 Motorola 25 DEC 01:54 50 16.56S 166 37.36W 305 08.2 0944 07.0 199
06 Pause to Remember 25 DEC 01:56 50 12.88S 165 48.60W 313 08.9 0970 07.0 204
07 Commercial Union 25 DEC 01:50 50 54.64S 166 18.48W 308 08.4 0973 07.0 187
08 Nuclear Electric 25 DEC 01:50 50 25.56S 165 38.04W 322 09.1 0982 07.0 200
09 Ocean Rover 25 DEC 01:50 50 35.20S 161 50.76W 296 09.1 1118 06.8 184
10 Time & Tide 25 DEC 01:50 50 01.52S 158 58.96W 293 09.2 1212 06.7 177
11 3Com 25 DEC 01:50 50 34.36S 159 05.44W 296 09.2 1218 06.7 176
12 Courtaulds Int. 25 DEC 01:50 49 11.92S 157 07.04W 273 07.4 1272 06.6 169
13 Concert 25 DEC 01:50 49 22.80S 156 17.88W 288 04.4 1305 06.6 115
14 Heath Insured II 25 DEC 01:50 51 03.68S 152 01.12W 246 06.9 1485 06.4 167

Key:
CMG -Course Made Good; course between last two known positions.
SMG -Speed Made Good; speed between last two known positions in knots.
DTF -Distance to Finish; great circle distance via waypoints to end of leg in nautical miles.
VMG -Velocity Made Good; average velocity towards leg finish in knots.
24 Hr Run -distance travelled over the last reported 24 hour period, in nautical miles.

Additional Information:
Weather Forecast issued by the Meteorological Office at 0730 on Tuesday 24rd December 1996: A large anti-cyclone initially
centred over New Zealand is expected to drift east during the rest of the week. This anti-cyclone, combined with a series of
depressions to the south of latitude 60S, will maintain winds between SW & NW. Winds are likely to become lighter at times in
the north of the area due to the close proximity of the anti-cyclone.
Concert has completed a rendez-vous with Courtaulds International, taken on extra fuel,and resumed course for Chatham Isle


[Table generated from Report 226 on 25 DEC 1996, 01:56.] (Go to top)

ARRIVAL TIMES
Yacht Name Status Arrival Time
(GMT)
Leg Time Penalty/Redress
+/- DD:HH:MM
DDD HH MM SS
01 Group 4 Racing 29 DEC 07:09:-- 038 14 09 23 .
02 Save the Children Racing 29 DEC 13:24:-- 038 20 24 58 .
03 Toshiba Wave Warrior Racing 30 DEC 05:04:-- 039 12 04 08 .
04 Global Teamwork Racing 30 DEC 10:47:-- 039 17 47 29 .
05 Motorola Racing 30 DEC 16:00:-- 039 23 00 48 .
06 Pause to Remember Racing 30 DEC 20:23:-- 040 03 23 35 .
07 Commercial Union Racing 30 DEC 20:41:-- 040 03 41 21 .
08 Nuclear Electric Racing 30 DEC 22:13:-- 040 05 13 37 .
09 Ocean Rover Racing 31 DEC 21:35:-- 041 04 35 32 .
10 Time & Tide Racing 01 JAN 14:21:-- 041 21 21 22 .
11 3Com Racing 01 JAN 15:19:-- 041 22 19 20 .
12 Courtaulds Int. Racing 02 JAN 01:15:-- 042 08 15 17 .
13 Concert DNF 02 JAN 07:29:-- 042 14 29 38 .
14 Heath Insured II Racing 03 JAN 18:24:-- 044 01 24 29 .

Key:
Leg Time Total elapsed time from start of leg to estimated/actual completion of leg, including any
penalty/redress, expressed in days, hours, minutes and seconds
Penalty/Redress modification to leg time as decided by international jury, expressed in days, hours and minutes.

Additional Information:
Concert is shown as DNF (Did Not Finish). If this is confirmed she will be awarded a finish time equal to that of the last
"racing" finisher plus 15 per cent.



Site IndexSite Front PageBack in siteNextSectionYourFeedbackSearch The Site
Let's Talk
Let's Talk
Site Help
Copyright British Telecommunications plc 1996.
Notices
(i) Copyright British Telecommunications plc 1996.
(ii) Access to this information/data or any part of this page via the World Wide Web must only be by linking to the relevant page on the BT Global Challenge Web Site. (http://www.btchallenge.com/results/latest/latest.htm)
(iii) This information/data was originally produced by "BT's Race Information System". BT shall not be liable for use of any part of it. Subject to (ii), you may use the information/data alone provided this notice is included.
(iv) You may copy and use any part of this page, other than on the World Wide Web, provided you include all of these notices. You must not charge for public use and before such use you must inform BT by facsimile to 0171 777 7444 or email to h.brierley@btinternet.com stating the intended use.
(v) Inform BT (as in notice (iv)) if your platform is not world wide web.
(vi) Map data was produced using MundoCart/CD (a digital product of Petroconsultants Group). BT shall not be liable for use of any part of it.