Location Report: 302 latest
Date: 12 APR 1997
Time: 08:20 (GMT)
Race Leg: 4 - Sydney to Cape Town

This page contains archived tables generated at the time shown.
You can use the bookmarks below to move quickly to each table.

Yacht Data Arrival Times Combined Times

(Back to Index)


[Table generated from Report 302 on 12 APR 1997, 08:20.] (Go to top)

YACHT DATA
Yacht Name Time of Fix
(GMT)
Latitude Longitude CMG SMG DTF VMG 24 hr run
01 Group 4 09 APR 01:35 33 53.60S 018 25.30E 000 00.0 0000 06.8 ---
02 Concert 09 APR 01:55 33 53.60S 018 25.30E 000 00.0 0000 06.8 ---
03 Toshiba Wave Warrior 09 APR 05:41 33 53.60S 018 25.30E 000 00.0 0000 06.8 ---
04 Commercial Union 09 APR 21:19 33 53.60S 018 25.30E 000 00.0 0000 06.7 ---
05 Motorola 10 APR 05:55 33 53.60S 018 25.30E 000 00.0 0000 06.6 ---
06 Save the Children 10 APR 09:53 33 53.60S 018 25.30E 000 00.0 0000 06.6 ---
07 3Com 10 APR 16:13 33 53.60S 018 25.30E 000 00.0 0000 06.5 ---
08 Global Teamwork 10 APR 16:48 33 53.60S 018 25.30E 000 00.0 0000 06.5 ---
09 Ocean Rover 11 APR 07:45 33 53.60S 018 25.30E 000 00.0 0000 06.4 ---
10 Time & Tide 11 APR 22:07 33 53.60S 018 25.30E 000 00.0 0000 06.3 ---
11 Nuclear Electric 12 APR 08:07 33 53.60S 018 25.30E 000 00.0 0000 06.3 ---
12 Courtaulds Int. 12 APR 08:14 34 05.44S 018 16.60E 030 01.8 0014 06.3 138
13 Pause to Remember 12 APR 08:14 34 10.16S 018 10.72E 351 01.1 0021 06.3 220
14 Heath Insured II 12 APR 08:20 34 11.80S 018 14.80E 071 02.5 0021 06.3 198

Key:
CMG -Course Made Good; course between last two known positions.
SMG -Speed Made Good; speed between last two known positions in knots.
DTF -Distance to Finish; great circle distance via waypoints to end of leg in nautical miles.
VMG -Velocity Made Good; average velocity towards leg finish in knots.
24 Hr Run -distance travelled over the last reported 24 hour period, in nautical miles.

Additional Information:
Three day forecast issued by The Meteorological Office at 0600GMT on Friday 11th April 1997.
Pressure remains high to the south maintaining mainly easterly winds along the route, the weather should remain fine and
warm with a small risk of isolated showers.


[Table generated from Report 302 on 12 APR 1997, 08:20.] (Go to top)

ARRIVAL TIMES
Yacht Name Status Arrival Time
(GMT)
Leg Time Penalty/Redress
+/- DD:HH:MM
DDD HH MM SS
01 Group 4 Finished 09 APR 01:35:05 037 23 05 05 .
02 Concert Finished 09 APR 01:55:26 037 23 25 26 .
03 Toshiba Wave Warrior Finished 09 APR 05:41:30 038 03 11 30 .
04 Commercial Union Finished 09 APR 21:19:23 038 18 49 23 .
05 Motorola Finished 10 APR 05:55:27 039 03 25 27 .
06 Save the Children Finished 10 APR 09:53:39 039 07 23 39 .
07 3Com Finished 10 APR 16:13:30 039 13 43 30 .
08 Global Teamwork Finished 10 APR 16:48:51 039 14 18 51 .
09 Ocean Rover Finished 11 APR 07:45:43 040 05 15 43 .
10 Time & Tide Finished 11 APR 22:07:29 040 19 37 29 .
11 Nuclear Electric Finished 12 APR 08:07:24 041 05 37 24 .
12 Courtaulds Int. Racing 12 APR 15:23:-- 041 12 53 31 .
13 Pause to Remember Racing 12 APR 18:39:-- 041 16 09 43 .
14 Heath Insured II Racing 12 APR 18:44:-- 041 16 14 11 .

Key:
Leg Time Total elapsed time from start of leg to estimated/actual completion of leg, including any
penalty/redress, expressed in days, hours, minutes and seconds
Penalty/Redress modification to leg time as decided by international jury, expressed in days, hours and minutes.

Additional Information:
Arrival times are provisional and subject to ratification by the Race Committee.


[Table generated from Report 302 on 12 APR 1997, 08:20.] (Go to top)

COMBINED TIMES
Yacht Name Status Combined Time
DDD HH MM SS
01 Group 4 Finished 110 19 59 34
02 Toshiba Wave Warrior Finished 111 18 14 34
03 Save the Children Finished 112 23 10 29
04 Motorola Finished 114 02 45 14
05 Commercial Union Finished 114 05 58 55
06 Global Teamwork Finished 116 12 12 41
07 3Com Finished 116 18 19 56
08 Ocean Rover Finished 117 10 24 30
09 Nuclear Electric Finished 117 17 38 50
10 Pause to Remember Racing 119 10 27 04
11 Time & Tide Finished 120 15 14 08
12 Heath Insured II Racing 120 20 16 21
13 Courtaulds Int. Racing 121 08 55 10
14 Concert Finished 122 15 24 21

Key:
Combined Time Total elapsed time from start of race to estimated/actual completion of current leg,
expressed in days, hours, minutes and seconds.

Additional Information:
All combined times are subject to ratification by the Race Committee.
For yachts still racing, combined times include their projected finish time for this leg.


Site IndexSite Front PageBack in siteNextSectionYourFeedbackSearch The Site
bt.com
bt.com
Site Help
Copyright British Telecommunications plc 1996.
Notices
(i) Copyright British Telecommunications plc 1996.
(ii) Access to this information/data or any part of this page via the World Wide Web must only be by linking to the relevant page on the BT Global Challenge Web Site. (http://www.btchallenge.com/results/latest/latest.htm)
(iii) This information/data was originally produced by "BT's Race Information System". BT shall not be liable for use of any part of it. Subject to (ii), you may use the information/data alone provided this notice is included.
(iv) You may copy and use any part of this page, other than on the World Wide Web, provided you include all of these notices. You must not charge for public use and before such use you must inform BT by facsimile to 0171 777 7444 or email to h.brierley@btinternet.com stating the intended use.
(v) Inform BT (as in notice (iv)) if your platform is not world wide web.
(vi) Map data was produced using MundoCart/CD (a digital product of Petroconsultants Group). BT shall not be liable for use of any part of it.