Location Report: 286 latest
Date: 11 APR 1997
Time: 06:02 (GMT)
Race Leg: 4 - Sydney to Cape Town

This page contains archived tables generated at the time shown.
You can use the bookmarks below to move quickly to each table.

Yacht Data Arrival Times Combined Times

(Back to Index)


[Table generated from Report 286 on 11 APR 1997, 06:02.] (Go to top)

YACHT DATA
Yacht Name Time of Fix
(GMT)
Latitude Longitude CMG SMG DTF VMG 24 hr run
01 Group 4 09 APR 01:35 33 53.60S 018 25.30E 000 00.0 0000 06.8 ---
02 Concert 09 APR 01:55 33 53.60S 018 25.30E 000 00.0 0000 06.8 ---
03 Toshiba Wave Warrior 09 APR 05:41 33 53.60S 018 25.30E 000 00.0 0000 06.8 ---
04 Commercial Union 09 APR 21:19 33 53.60S 018 25.30E 000 00.0 0000 06.7 ---
05 Motorola 10 APR 05:55 33 53.60S 018 25.30E 000 00.0 0000 06.6 ---
06 Save the Children 10 APR 09:53 33 53.60S 018 25.30E 000 00.0 0000 06.6 ---
07 3Com 10 APR 16:13 33 53.60S 018 25.30E 000 00.0 0000 06.5 ---
08 Global Teamwork 10 APR 16:48 33 53.60S 018 25.30E 000 00.0 0000 06.5 ---
09 Ocean Rover 11 APR 05:58 33 53.28S 018 21.56E 064 02.8 0003 06.4 156
10 Time & Tide 11 APR 05:58 35 02.96S 019 00.04E 288 09.9 0081 06.4 172
11 Nuclear Electric 11 APR 06:02 35 17.72S 020 16.36E 286 09.7 0138 06.3 153
12 Courtaulds Int. 11 APR 05:58 35 03.24S 021 29.92E 270 08.7 0188 06.3 199
13 Heath Insured II 11 APR 06:02 35 48.84S 022 09.72E 290 08.7 0234 06.2 191
14 Pause to Remember 11 APR 06:00 35 47.40S 022 21.40E 275 09.8 0242 06.2 199

Key:
CMG -Course Made Good; course between last two known positions.
SMG -Speed Made Good; speed between last two known positions in knots.
DTF -Distance to Finish; great circle distance via waypoints to end of leg in nautical miles.
VMG -Velocity Made Good; average velocity towards leg finish in knots.
24 Hr Run -distance travelled over the last reported 24 hour period, in nautical miles.

Additional Information:
Three day forecast issued by The Meteorological Office at 0600GMT on Friday 11th April 1997.
Pressure remains high to the south maintaining mainly easterly winds along the route, the weather should remain fine and
warm with a small risk of isolated showers.


[Table generated from Report 286 on 11 APR 1997, 06:02.] (Go to top)

ARRIVAL TIMES
Yacht Name Status Arrival Time
(GMT)
Leg Time Penalty/Redress
+/- DD:HH:MM
DDD HH MM SS
01 Group 4 Finished 09 APR 01:35:05 037 23 05 05 .
02 Concert Finished 09 APR 01:55:26 037 23 25 26 .
03 Toshiba Wave Warrior Finished 09 APR 05:41:30 038 03 11 30 .
04 Commercial Union Finished 09 APR 21:19:23 038 18 49 23 .
05 Motorola Finished 10 APR 05:55:27 039 03 25 27 .
06 Save the Children Finished 10 APR 09:53:39 039 07 23 39 .
07 3Com Finished 10 APR 16:13:30 039 13 43 30 .
08 Global Teamwork Finished 10 APR 16:48:51 039 14 18 51 .
09 Ocean Rover Racing 11 APR 06:28:-- 040 03 58 10 .
10 Time & Tide Racing 11 APR 16:08:-- 040 13 38 01 .
11 Nuclear Electric Racing 11 APR 23:14:-- 040 20 44 46 .
12 Courtaulds Int. Racing 12 APR 05:29:-- 041 02 59 27 .
13 Heath Insured II Racing 12 APR 11:16:-- 041 08 46 40 .
14 Pause to Remember Racing 12 APR 12:15:-- 041 09 45 34 .

Key:
Leg Time Total elapsed time from start of leg to estimated/actual completion of leg, including any
penalty/redress, expressed in days, hours, minutes and seconds
Penalty/Redress modification to leg time as decided by international jury, expressed in days, hours and minutes.

Additional Information:
Arrival times are provisional and subject to ratification by the Race Committee.


[Table generated from Report 286 on 11 APR 1997, 06:02.] (Go to top)

COMBINED TIMES
Yacht Name Status Combined Time
DDD HH MM SS
01 Group 4 Finished 110 19 59 34
02 Toshiba Wave Warrior Finished 111 18 14 34
03 Save the Children Finished 112 23 10 29
04 Motorola Finished 114 02 45 14
05 Commercial Union Finished 114 05 58 55
06 Global Teamwork Finished 116 12 12 41
07 3Com Finished 116 18 19 56
08 Nuclear Electric Racing 117 08 46 12
09 Ocean Rover Racing 117 09 06 57
10 Pause to Remember Racing 119 04 02 55
11 Time & Tide Racing 120 09 14 40
12 Heath Insured II Racing 120 12 48 50
13 Courtaulds Int. Racing 120 23 01 06
14 Concert Finished 122 15 24 21

Key:
Combined Time Total elapsed time from start of race to estimated/actual completion of current leg,
expressed in days, hours, minutes and seconds.

Additional Information:
All combined times are subject to ratification by the Race Committee.
For yachts still racing, combined times include their projected finish time for this leg.


Site IndexSite Front PageBack in siteNextSectionYourFeedbackSearch The Site
bt.com
bt.com
Site Help
Copyright British Telecommunications plc 1996.
Notices
(i) Copyright British Telecommunications plc 1996.
(ii) Access to this information/data or any part of this page via the World Wide Web must only be by linking to the relevant page on the BT Global Challenge Web Site. (http://www.btchallenge.com/results/latest/latest.htm)
(iii) This information/data was originally produced by "BT's Race Information System". BT shall not be liable for use of any part of it. Subject to (ii), you may use the information/data alone provided this notice is included.
(iv) You may copy and use any part of this page, other than on the World Wide Web, provided you include all of these notices. You must not charge for public use and before such use you must inform BT by facsimile to 0171 777 7444 or email to h.brierley@btinternet.com stating the intended use.
(v) Inform BT (as in notice (iv)) if your platform is not world wide web.
(vi) Map data was produced using MundoCart/CD (a digital product of Petroconsultants Group). BT shall not be liable for use of any part of it.