Location Report: 127 latest
Date: 16 JUL 1997
Time: 08:04 (GMT)
Race Leg: 6 - Boston to Southampton

This page contains archived tables generated at the time shown.
You can use the bookmarks below to move quickly to each table.

Yacht Data Arrival Times Combined Times

(Back to Index)


[Table generated from Report 127 on 16 JUL 1997, 08:04.] (Go to top)

YACHT DATA
Yacht Name Time of Fix
(GMT)
Latitude Longitude CMG SMG DTF VMG 24 hr run
01 Group 4 16 JUL 01:06 50 53.15N 001 23.75W 000 00.0 0000 07.7 ---
02 Toshiba Wave Warrior 16 JUL 02:39 50 53.15N 001 23.75W 000 00.0 0000 07.6 ---
03 Concert 16 JUL 04:07 50 53.15N 001 23.75W 000 00.0 0000 07.6 ---
04 Save the Children 16 JUL 07:52 50 27.44N 002 08.12W 096 08.3 0044 07.4 155
05 Commercial Union 16 JUL 07:50 50 27.56N 002 09.60W 090 08.5 0045 07.4 168
06 Nuclear Electric 16 JUL 08:02 50 25.32N 002 34.52W 043 08.2 0060 07.4 201
07 Global Teamwork 16 JUL 08:04 50 24.28N 002 39.64W 050 08.2 0064 07.4 206
08 Ocean Rover 16 JUL 07:52 50 23.00N 002 44.00W 076 08.2 0067 07.4 206
09 Heath Insured II 16 JUL 07:52 50 17.84N 002 48.72W 084 08.0 0072 07.3 198
10 3Com 16 JUL 07:56 50 15.68N 002 47.60W 100 07.0 0072 07.3 188
11 Courtaulds Int. 16 JUL 07:52 50 20.04N 002 56.64W 099 07.8 0075 07.3 195
11 Motorola 16 JUL 07:52 50 19.80N 002 56.48W 095 08.8 0075 07.3 195
13 Pause to Remember 16 JUL 07:52 50 20.12N 002 56.80W 099 08.8 0075 07.3 193
14 Time & Tide 16 JUL 07:52 49 47.48N 005 19.60W 086 08.0 0173 07.1 185

Key:
CMG -Course Made Good; course between last two known positions.
SMG -Speed Made Good; speed between last two known positions in knots.
DTF -Distance to Finish; great circle distance via waypoints to end of leg in nautical miles.
VMG -Velocity Made Good; average velocity towards leg finish in knots.
24 Hr Run -distance travelled over the last reported 24 hour period, in nautical miles.

Additional Information:
Three day weather forecast issued by the Meteorological Office at 0500 UTC on Tuesday 15 July 1997:
A moist west or southwesterly flow will cover the race route at first, with occasional drizzle expected to together with poor
visibility at times with the risk of sea fog. A weak cold front will improve visibility from the west as winds veer northwesterly,
dispersing sea fog. This clearance is expected to reach Southampton during the early hours of Wednesday morning.


[Table generated from Report 127 on 16 JUL 1997, 08:04.] (Go to top)

ARRIVAL TIMES
Yacht Name Status Arrival Time
(GMT)
Leg Time Penalty/Redress
+/- DD:HH:MM
DDD HH MM SS
01 Group 4 Finished 16 JUL 01:06:58 016 07 36 58 .
02 Toshiba Wave Warrior Finished 16 JUL 02:39:46 016 09 09 46 .
03 Concert Finished 16 JUL 04:07:41 016 10 37 41 .
04 Save the Children Racing 16 JUL 13:51:-- 016 20 21 46 .
05 Commercial Union Racing 16 JUL 13:55:-- 016 20 25 44 .
06 Nuclear Electric Racing 16 JUL 16:12:-- 016 22 42 20 .
07 Global Teamwork Racing 16 JUL 16:42:-- 016 23 12 48 .
08 Ocean Rover Racing 16 JUL 16:56:-- 016 23 26 00 .
09 Heath Insured II Racing 16 JUL 17:37:-- 017 00 07 20 .
10 3Com Racing 16 JUL 17:44:-- 017 00 14 48 .
11 Courtaulds Int. Racing 16 JUL 18:07:-- 017 00 37 36 .
11 Motorola Racing 16 JUL 18:07:-- 017 00 37 36 .
13 Pause to Remember Racing 16 JUL 18:08:-- 017 00 38 07 .
14 Time & Tide Racing 17 JUL 08:11:-- 017 10 41 39 - 00:04:00

Key:
Leg Time Total elapsed time from start of leg to estimated/actual completion of leg, including any
penalty/redress, expressed in days, hours, minutes and seconds
Penalty/Redress modification to leg time as decided by international jury, expressed in days, hours and minutes.

Additional Information:
Arrival Times are calculated on 'best estimate' based on weather and sea conditions and are subject to change.
All arrival times are subject to ratification by the Race Committee.


[Table generated from Report 127 on 16 JUL 1997, 08:04.] (Go to top)

COMBINED TIMES
Yacht Name Status Combined Time
DDD HH MM SS
01 Group 4 Finished 161 05 25 18
02 Toshiba Wave Warrior Finished 163 11 14 34
03 Save the Children Racing 165 20 10 09
04 Motorola Racing 165 21 35 06
05 Commercial Union Racing 167 07 23 17
06 Global Teamwork Racing 169 18 41 27
07 Nuclear Electric Racing 170 23 30 09
08 Ocean Rover Racing 171 09 48 05
09 3Com Racing 171 10 32 23
10 Pause to Remember Racing 172 18 06 08
11 Courtaulds Int. Racing 173 18 23 50
12 Heath Insured II Racing 174 08 35 01
13 Concert Finished 174 21 36 29
14 Time & Tide Racing 176 17 46 45

Key:
Combined Time Total elapsed time from start of race to estimated/actual completion of current leg,
expressed in days, hours, minutes and seconds.

Additional Information:
Above combined times for yachts yet to finish are based on their estimated finish time.
All times are subject to ratification by the Race Committee.


Site IndexSite Front PageBack in siteNextSectionYourFeedbackSearch The Site
bt.com
bt.com
Site Help
Copyright British Telecommunications plc 1996.
Notices
(i) Copyright British Telecommunications plc 1996.
(ii) Access to this information/data or any part of this page via the World Wide Web must only be by linking to the relevant page on the BT Global Challenge Web Site. (http://www.btchallenge.com/results/latest/latest.htm)
(iii) This information/data was originally produced by "BT's Race Information System". BT shall not be liable for use of any part of it. Subject to (ii), you may use the information/data alone provided this notice is included.
(iv) You may copy and use any part of this page, other than on the World Wide Web, provided you include all of these notices. You must not charge for public use and before such use you must inform BT by facsimile to 0171 777 7444 or email to h.brierley@btinternet.com stating the intended use.
(v) Inform BT (as in notice (iv)) if your platform is not world wide web.
(vi) Map data was produced using MundoCart/CD (a digital product of Petroconsultants Group). BT shall not be liable for use of any part of it.